At what temperature can you make a blind area around the house?

When planning a country house, even an inexperienced developer knows what he will need for construction and is aware in advance of the necessary components of a country house (foundation, walls, roof, ceilings, windows and doors). However, there is one more component in the construction of a summer house, which is not formally included in the scope of the house and therefore is often not paid attention to.

Many people forget about the blind area. But in vain! This is fraught with unpleasant consequences

And if they do, they leave its arrangement for a vague “later”, mistakenly believing that there is no urgency in its construction, because “there is no rain on us.” There is perhaps no more inappropriate saying when it comes to the blind area. The fact is that she’s just “dropping” on her! And if mistakes were made during construction, drops often lead to irreversible results.

If you don't have a blind area.

The editorial inbox receives letters with annoying regularity in which summer residents talk about loose foundations, cracks in the walls, and lopsided corners. As real practice shows, this problem often appears as a result of the influence of ground moisture on the “zero cycle” and the movement of heaving soils. But this disaster could definitely have been avoided if the foundation had been protected. This is precisely what the blind area is intended for. That is, it is a mandatory technological component for most types of foundations, and not an additional item of unforeseen expenses imposed by greedy builders in an already growing budget, as many summer residents think.

If the foundation is not protected by a blind area, the appearance of cracks in the walls is a matter of time

It becomes all the more offensive for inexperienced dacha developers, who very, very often do not pay attention to the obligation to implement it. And not only due, but not at all. As a result, the foundation is deprived of protection and becomes directly accessible to moisture, as a result... see above, where we talked about drops.

We build a blind area according to the norms and rules

I hope I have convinced you of the need to arrange a capital blind area. Then let's move on to the nuances of construction, which everyone who is to build housing must know.

There are two known types of blind areas - hard and soft. When covering the first, concrete, asphalt, stone, paving slabs are used, and for the second, gravel, lawn, and light tiles are used.

You can use lawn to cover the soft blind area

First of all, I think, it is necessary to eliminate the typical technological mistakes that inexperienced builders make when constructing both types of blind area.

When can you insulate yourself, and when should you turn to professionals?

The blind area is one of the simplest elements in the construction of a private house. Any homeowner who knows how to work with their hands can handle it themselves. The main thing is to follow the technology of the device and correctly create a “layer cake” from building materials inside the structure.

There are 3 types of blind area:

  1. Tough. It is based on pouring concrete or paving. The participation of specialists is recommended here, since the technology is labor-intensive and will require hiring equipment and auxiliary tools.
  2. Semi-rigid. The final covering here is made of paving slabs, which lie on a concrete base.
    Laying out the material and pouring the base require certain skills; it is not always possible to carry out the process efficiently the first time on your own.
  3. Soft blind area. The technology does not involve concrete, so this process is easier to do yourself.

Accordingly, you can insulate the blind area with your own hands with a soft coating that does not require the participation of equipment and concrete work. For other types of coating, the intervention of professionals may be required, but if you act carefully and according to the instructions, insulation and installation of the coating yourself is possible for everyone.

Mistake #1. Dimensions and location

Waterproof blind areas must be constructed around each building. Everything is clear with the length, it is equal to the perimeter of the building, but what should the width be? Is it possible to make the blind area narrow? No way! This would be a fatal mistake! Drops of rain falling from the roofing edge (even with a well-organized drainage system they will still occur) should not fall on open ground. That is, the width of the blind area should be approximately 20 cm wider than the size of the roof overhang.

Manufacturing on stilts

Installing a blind area on screw piles does not require thorough knowledge. The main rule is to comply with the basic requirements and rules.

To reduce the cost, we choose concrete as a coating. For the pillow we use:

  • crushed stone;
  • coarse alluvial sand.

With this choice of materials, possible deformation as the temperature decreases will be compensated.

If the house is on stilts, then the base must have ventilation holes, at a height of 40-50 cm from the blind area with mesh protection.

Advice!

In winter, it is better to fill such holes with material to avoid possible freezing.

It is necessary to lay expansion joints using wooden boards, pour concrete in the sections between them and make tiled cladding.

Mistake #2. Stagnant water

Water that has fallen from the roof remains on the surface of the blind area and forms puddles next to it. This only means that the authors of the blind area did not take care of the slope of its surface. According to the above-mentioned standards MGSN 1.02-02 TSN 30-307-2002, the transverse slope of the blind area should be taken at least 10%. For example, if the width of the protective tape at your dacha is planned to be 1 m, then the height difference between the longitudinal sides of the formwork should be about 10 cm, and no less!

The importance of lateral slope

A failed height difference can be a consequence of unsuccessful concreting of a monolithic blind area if, at the stage of hardening of the concrete mixture, the builders did not ensure that it was given a transverse slope, and the concrete “stacked” into a horizontal position.

The blind area should drain water from the foundation

Drainage trays for drainage along the outer perimeter

The story with water does not end there: to drain it along the outer perimeter of the blind area, it is advisable to provide drainage trays. These can be modern plastic boxes, closed on top with metal bars, or simply sawn along the pipe, laid on a reliable base.

And we will take care of beauty

And it is reasonable to frame the structure of the blind area around the perimeter with curb paving stones. It will give the building architectural completeness.

Requirements

There is an existing number of regulatory requirements that tell about its purpose, dimensions, angle of inclination, and other information. It is not indicated in what order the actions should be carried out. The plumb dimensions of the building roof are not related to the width, since all water from the roof must drain through the drainage and drainage system. But it is still recommended to retreat 25-30 cm from the projection of the roof edge.

Mistake #3. Violation of regulations for concrete work

The sad consequence of mistakes of this kind will be the appearance of cracks on the concrete surface of the blind area. How they threaten the foundation structure is not difficult to guess even for a summer resident who is far from construction.

Concrete production must be carried out strictly according to the rules.

The composition of the concrete mixture is probably known to every summer resident: cement, coarse aggregate (crushed stone fraction up to 20 mm), fine aggregate (sand), water. Then why are there so many mistakes on the dacha horizon? The answer is clear: firstly, the errors lie in the incorrect mixing algorithm. Secondly, in violation of the weight ratio of the components: this often happens if they are measured by eye. Experts strongly recommend abandoning such frivolity. Making concrete is not a case where you can count on chance. You can accurately dose the components even in country conditions. How ? In my opinion, nothing better than ordinary buckets has yet been invented, and if in addition you use a steelyard (even a very simple one), the weighing accuracy will be sufficient.

Cracks in the blind area are the result of improperly prepared concrete mixture

Concrete mix proportions

Sequence of mixing components

Mixing time

How long does it take to rotate the bulb of a household concrete mixer? To mix the dry ingredients, 2 minutes are enough, and after gradually adding water, another 2 minutes.

Not only the sequence of adding components is important, but also the mixing time

Eliminate the appearance of cracks

Compaction and tilt

The final stage of concreting is compacting the concrete mixture and imparting a slope in the transverse direction. You will have to rent a vibrating plate, the operation of which will ensure high quality finishing work.

Mistake #4. The blind area was not insulated

Such an error will lead to negative consequences. If the blind area is not insulated, frost heaving inevitably occurs on heaving soils (clayey, silty sandy loam, loam) in winter, which has a most destructive effect on the foundation structure.

To avoid destruction of the foundation, experts recommend not saving on insulation of the blind area

Advantages of an insulated blind area

  • in normal soils, an insulated blind area protects the foundation from the appearance of cracks (when melt and sediment water penetrates into the concrete, which can destroy it when frozen);
  • reduces the impact of external low temperatures and reduces home heating costs.

Functions

Blind areas play an important role; their high-quality implementation can protect the foundation of the task from rain and flood waters. Arranging a tape with a hard coating at a certain angle will protect the soils lying along the perimeter of the building from getting wet; if the building’s foundation is poorly waterproofed, it will protect it from getting wet and absorbing any moisture. When frost sets in, moisture that gets into existing cracks or microcracks can expand, which will lead to the destruction of the foundation.

Attention!

Water accumulated in the soil will cause it to swell and destruction will begin.

It is important to consider what soils we are dealing with during construction. For example, clay and loamy soils can directly affect the durability of load-bearing structures. When moisture enters, this type of soil begins to play and form subsidence, causing:

  • foundation deformations;
  • formation of places with divergence of walls.

This element gives completeness to the capital construction project. It can be reunited with the finishing elements of the local area.

Mistake #5. Soft blind area allows moisture to reach the foundation

When constructing a soft blind area, its top finishing coating can be compacted gravel, green lawn or metlakh tiles. Of course, such coatings require reliable waterproofing protection. The optimal solution to the problem is to use a profiled membrane PLANTER-geo (TechnoNIKOL) and install it on the wall of the house. It will create a sealed layer and block the penetration of precipitation to the foundation.

The PLANTER-geo membrane is laid with an overlap on the wall of the house

High technology guarding buildings

The membrane fabric consists of two layers:

  • the lower one is made of high-density polyethylene, has protrusions on the surface in the form of spikes, forming a drainage gap to drain water from the house;
  • the top layer is geotextile, which filters water and prevents clogging of the drainage gap.

Waterproofing membrane PLANTER geo
The cost of such a high-tech membrane is close to 250 rubles per 1 m².

Which material to choose?

Since the material is subject to rather stringent requirements, only a few are suitable for insulating blind areas. Each of them can be installed independently.

Expanded polystyrene

A type of foam plastic, it is used more often than other materials due to its versatility and low cost.

Advantages:

  • low thermal conductivity and moisture absorption;
  • high strength;
  • frost-resistant;
  • flexible;
  • service life reaches 80 years.

Disadvantages: flammable, it is important to securely lock it under the top layer of the blind area and cover it with the plinth facing material.

Suitable for all types of blind areas, ideal for concrete coverings , but it is necessary to lay it with additional insulating material (film or geotextile) to eliminate mechanical impact and the possibility of fire.

Penoizol

It is sprayed on the base of the building and on the bottom of the trench, under the blind area, where a cushion of clay, sand and geotextile is laid.

Advantages:

  • applied without joints, in a uniform layer from a special machine with a sprayer;
  • dense, does not absorb moisture;
  • low thermal conductivity;
  • does not allow oxygen to pass through.
  • durable, non-flammable.

Flaws:

  • application requires the participation of specialists with equipment;
  • toxic, respiratory protection is required for all those present and isolation of the neighboring area (so that the plants are not damaged).

Penoizol is not recommended for regions with high humidity and places where there is heavy rain. The material cannot withstand excess water levels and its application is expensive. Sold in various forms, including sliced.

Styrofoam

One of the most famous materials, elastic, is suitable for strengthening expansion joints.

Pros:

  • low thermal conductivity;
  • affordable;
  • easy to lay and model to the desired shape.

High-quality blind area is easy

The main thing is to eliminate the mistakes listed above and use high-quality materials. Once again, I will allow myself to recommend that summer residents (in their own interests!) do not skimp on the construction of a blind area, because the strength of the structure depends on how reliably it protects the foundation! In my opinion, to build a high-quality blind area, it is technically correct to use both products mentioned in the article.

  1. CARBON ECO slabs are laid on the prepared base (compacted sand) (thereby we protect the foundation from frost).
  2. To reliably protect the blind area from the negative effects of moisture, a profiled PLANTER-geo membrane is laid on top of the thermal insulation. It is recommended to form a connection between the sheets by overlapping the membranes into four tenons and additionally gluing the joints with PLANTERBAND tape; geotextiles should also be joined together with adhesive tape.
  3. Next, you can begin to form the finishing layer of gravel or plant substrate; another layer of sand is poured under the tiles or natural stone.

Proper heat and waterproofing during the construction of the blind area.
Photo from the site ivanovo.tiu.ru As you can see, the use of modern high-tech materials is justified: with their help you will create a reliable and beautiful (which is also important, you must admit!) blind area that will faithfully protect the foundation of your house for many years. A blind area around the house is a necessity, but it doesn’t always make sense to make it permanent for years and decades. For example, the building is old and it is planned to be demolished in the near future.

And sometimes it is simply not possible to build such a structure: there is not enough time, effort, materials, etc. In such cases, a temporary blind area will help out. It will divert water from the foundation in good faith, and that is all that is required of it.

Slate for temporary blind area

Any type of slate that is available to you will do. It can be old-style asbestos-cement slate, corrugated bitumen slate, fiber-cement slate or plastic. In principle, all types of slate are intended for roofing, therefore they are resistant to water, high and low temperatures, and ultraviolet radiation.

But if you have the opportunity to create a blind area only using sheets of old asbestos-cement slate, keep in mind that lichens and mosses will settle on it. On the roof they are a rare occurrence due to the height of their location, but they can quickly master surfaces close to the ground. Therefore, such slate can and should be protected by painting it with acrylic paint for exterior use - it has both frost and moisture resistance.

Painting will protect the slate not only from parasitic plants, but also from destruction. In addition, such a blind area will look much more decorative.

How to make a simple drainage system

Along the edge of the slate structure we dig another trench - narrower than the blind area itself. The water that flows down the slate waves will fall into it.

We fill the drainage trench with an even layer of drainage (pebbles, pieces of brick, crushed stone - whatever). It is important that grass does not grow through the drainage, otherwise the efficiency of drainage will quickly decline, and the permeability of water may decrease so much that it will stand on the surface. Therefore, having filled the trench halfway, you should lay a permeable material such as spunboard - it will not allow grass to grow.

If possible, you can arrange a more serious drainage system. For example, make a trench with a slope into a drainage basin and equip it with trays for water drainage.

How to make a simple water catcher

We dig a hole deeper so that a container can fit into it - for example, a barrel or a large saucepan, etc.

We lay drainage trays in the trench, ultimately leading them into the drainage basin.

Options with drainage trays. You can buy the trays themselves and the gratings for them, but this will require funds that are not always rational to spend on installing a temporary blind area and drainage to it. Although there is also a choice here - concrete or plastic trays. In addition, if the temporary blind area is replaced with a permanent one in the future, the drainage system can be left.

But if this is really a temporary construction, you can cut metal or plastic pipes in half lengthwise, thus obtaining full-fledged trays. And instead of store-bought grilles, use any mesh - even ordinary chain-link.

The blind area around the house, even if it is the simplest, but arranged correctly, will protect the foundation and walls of the building from water and dampness.

To move into a house, you first need to build it and equip it to the maximum. I wish it was like that. But more often than not, something somewhere is unfinished and the work has to be completed during the period of operation of the building.

Blind areas quite often appear among the deficiencies. But a temporary blind area option can be implemented very quickly and simply - using old linoleum removed from the floors of a city apartment during renovation.

Linoleum in strips up to 1 m wide is laid around the building, and in order for it to be tightly pressed to the ground, it can be pressed down with bricks, or even attached with nails 150-200 mm long (driving them into the ground. But, of course, first you need to ensure the necessary slope from the walls of the house. As a result, we get a temporary blind area - good protection for the underground from water in the spring and from rain and grass in the summer.

By leaving a comment you agree to the Privacy Policy

see also

Comments 54

Lay the EPS with a slope; if you put some kind of LDPE membrane over the EPS (for example, profiled membranes), then you can lay a lawn

No, I won't do that. For now I just want a concrete blind area. Over time I will put tiles on top.

Well, first of all, I wrote about the slope of the EPS - the rest is a matter of taste and color

Understood thanks! I plan to set the slope at the trench digging stage. I think 3 cm per 1 m is enough. the blind area will also be a sidewalk.

My mother-in-law’s team did it, they removed a layer of soil, leveled it, laid foam plastic about 3 cm thick, then concrete with reinforced mesh was poured in 2 m segments. Now people are starting to use foam plastic or rags under the sidewalks, the output doesn’t crack. But not tested by time)

Clear. Thank you. I decided to lay EPS on sand and foam the seams.

I don’t know what I think), but I removed the entire fertile layer (40-50cm) deep. I threw geotextiles and covered everything with sand. I will put paving slabs on top of the sand.

In the place where water enters the house, under the sand there is eps.

I don’t know what I think), but I removed the entire fertile layer (40-50cm) deep. I threw geotextiles and covered everything with sand. I will put paving slabs on top of the sand.

In the place where water enters the house, under the sand there is eps.

The fertile layer is needed for the beds)))

I don’t have a fertile layer yet, I haven’t brought it in yet. :-))

I also made a blind area. The roofing material was replaced with a black film-fabric (from weeds), then sand, crushed stone was concreted, laying pieces of wood every 2 meters (like frost joints), and then the tiles were laid at an angle on a cement-sand mixture. The film was laid in 2 layers so that it separated the concrete screed from the foundation.

Thank you. Why was the roofing felt replaced with fabric?

Ruberoid will fall apart over time. And this fabric lasts longer.

I would do this. the bottommost layer is geotextile. then you sprinkle crushed stone or sand as a cushion. then you lay down waterproofing (isospan D, polyethylene films, roofing felt, which is not a pity) and fill it all with concrete, reinforced with a 50X50X3 mm mesh.

Is geotextile a dornite?

yes, there are many names. non-woven, needle-punched, I don’t care what it is.

There is nothing for roofing felt to do under the blind area

Can you explain why?

Your wall is waterproofed (I hope “roofing felt” is not in the literal sense, but as a name for a type of roll insulation), and penoplex will work as a layer for the blind area. and a layer of sand and crushed stone will improve drainage, which is done along the contour of your foundation

It's clear. The wall is not yet insulated. I plan to spread bitumen mastic on the wall, and then either roofing felt or some other rolled insulator. I did not plan drainage along the contour of the house.

poured 15-20 cm of crushed stone or sand; after the reinforcement is 8-10 (you can get thicker if you use a car, it’s not critical) and the mesh is 100*100*2. knitted with wire. I did that to myself. The slope from the house is slight. I have 5 cm per meter. thickness from 150 to 100mm from the wall/foundation to the edge in descending order. All

Clear. Thank you. But our winters will be harsher, so I decided to bother with insulation.

Now I’m making a blind area myself... sand, crushed stone, thin film, reinforced concrete with plasticizers from water... It seems to me that there is no point in rubyroid, unless the joints are fused, and then I don’t understand how water can seep through there through inclined concrete... and there’s no point in insulation either I don’t see...what to heat. and he will bear the money well... I have a blind area 2 meters from the house, and on one side there are 5

Roofing felt is recommended everywhere as waterproofing. It will not just be at the bottom, but will also rise up onto the wall, and from it there will also be an expansion joint between the blind area and the foundation. Insulation is needed to move the freezing zone away from the foundation so that it does not affect it. Your blind area is wide... I agree with taking out the money in this case...

I have eps with roofing felt on the foundation itself along the perimeter, and the blind area is made under the main insulation of the house

Now I’m making a blind area myself... sand, crushed stone, thin film, reinforced concrete with plasticizers from water... It seems to me that there is no point in rubyroid, unless the joints are fused, and then I don’t understand how water can seep through there through inclined concrete... and there’s no point in insulation either I don’t see...what to heat. and he will bear the money well... I have a blind area 2 meters from the house, and on one side there are 5

Was crushed stone also poured on top of the sand? Can you be more specific about the thickness of the layers?

Sand about 20, crushed stone about 10, concrete 5-10... everything is approximately, because I didn’t dig under the blind area, but rather raise the level of the site

Rating
( 1 rating, average 4 out of 5 )
Did you like the article? Share with friends: